Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Item

Desired Outcome

Time

Who

Notes

Decisions

Local group takeaways

Actions

1

Updates (please add in advance)

10 mins

UCLA (Hermine):

  • Winding down local RMFG group, with a few outstanding issues:

    • Bound-with best practices

    • E-bookplates and collections codes

    • Authority control

Gem has downloaded MARCIVE files into production. The loading will happen soon!

 

2

WorldCat Updates

20 mins

Liz is asking for feedbacks on the test batch.

 

583 came through

 

Jean notices the presence of non-Latin script parallel fields in the Russian records and is happy about it. Disappointed to notice some lower quality changes made to the OCLC master records were brought in.

 

UCLA folks are generally happy with the result.

 

11 multimatch records in this batch. When importing them via the import profile, they came through but the report showed there was no record deleted even when merged records were deleted. Gem will investigate more and figure out what happened.

 

Liz and Gem will try loading another 75 files this week and see whether they go through smoothly.

If folks discover something bad during this next batch loading for the next two weeks, let Liz/Gem know and they can stop the job.

 

If you are curious about if a bib is being merged, check if there is a NZ MMS ID in 904.

3

Authority records

Review new reports from CDL

15 mins

Feedback from UCLA:

  • Mostly big questions about how this work can be distributed equitably.

  • Non-roman paired headings: in the past we’ve consulted our language experts to check them when making changes to the romanized headings--should that continue when the record may not be something we own?

  • 1XX/240 control - any possibilities?

UCLA data maintenance team has closely examined these reports and a concern over the workload has emerged. They also identified some oddities such as medium terms in 382.

 

Hopefully, the next RMFG will figure out a workflow.

 

Wish list:

1.A separate report for each campus to review will be ideal.

2.Take advantage of AlmaRefine or OpenRefine to weed false positive entries.

More reports will be made available in January for those who are interested in reviewing

4

Phase 4 wrap-up