Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Item

Desired Outcome

Time

Who

Notes

Decisions

Actions

1

Co-chairs update

5

Christine

2

Blog posts

Determine where local group blog posts should go – their local space or the project home space?

Project blog – what’s the process for cohort members to contribute a post? Can anyone post? Does it funnel through PMs or Com Leads?

ILSDC post: https://uc-sils.atlassian.net/l/c/c6YLVn1q

5

Lena

3

(Ops Leads) Communication pathways

Discuss what the appropriate lines of communication are for flow of information between systemwide project and local campus groups.

June 4, Ben & Adrian were tasked to discuss whether a single contact is needed for communication with local campus groups and bring back to Ops Leads. (See June 4 Com Leads notes)”

(from parking lot) Communication contact for each campus? What work would we be giving this contact? We’ve got campus reps on every group except the Ops Leads – is this sufficient?

From IC charge: Serve as the campus primary contacts for the SILS (the SILS Service manager is the primary contact for coordinating with the vendor);

20

Ben & Adrian

4

Timeline

Determine what events and format will be most effective in the Confluence project timeline for Confluence.

Timeline

Timeline (table)

15

Lena

5

(Op Leads) SILS Principles

Revising SILS principles for phase 4.

https://docs.google.com/document/d/1jnIx3ufU8XFkG0Uq13NCIZoZ7cIxMgcElzjthhGykuo/edit

Anything to add/edit?

10

Christine

HOLD for week of 6/8

6

(PM Leads) Ongoing checkin

  1. Is anything blocked or behind schedule?

  2. What deliverables are coming in the next week?

  3. Any decisions, consultations or approvals needed in the next week? 

  4. Do you need anything?

0

All

7

(COM) SILS News

Awareness of upcoming communications and anything needed

0

Ben, Adrian

8

Parking Lot

9

Total

60/60

...