Legend:

Status

Scope

Go-live

Description

Provide best practices for how to set up campus IZ Gateways and the options for the NZ Gateway

Decision

See below

Owning group

RMFG

Approver

PPC

Stakeholders

R = RMFG
A = RMFG
C = Campuses
I = ICs

Decision-making process

Priority

Due date

Recommendation

*Note that this decision does not encompass the “Digital Collection Gateway (DCG) used by CDL.”*

Campuses can choose between the following methods for getting records into the Network Zone using the OCLC Export Gateway (set up documentation). Note that the OCLC Gateway export will not set or unset holdings in OCLC. In order to reduce errors and staff frustration, RMFG recommends that campuses choose one method for their catalogers instead of trying to switch between Gateways. Regardless of which method is chosen, any merge or normalization processes applied to OCLC records that wind up in the NZ must conform with RMFG best practices for working in the UC Network Zone, including searching the NZ before going into OCLC Connexion. Campuses should also be aware that any NZ-linked records that are in-scope for WorldCat Daily Updates can be overlaid through that process and so fields removed during local normalization will likely come back into the records.


  1. NZ Gateway login will always allow users to add new records to the NZ and update existing NZ records. It cannot be used to export local campus extensions.

2. IZ Gateway login will behave differently depending on how the OCLC integration profile “Use Network Zone” setting is configured:   

       

Reasoning

While the goal is to get OCLC records into the NZ, some campuses prefer to use an IZ Gateway and link up to the NZ instead of importing directly into the NZ. In addition, local fields behave differently with the IZ Gateway and so it is, in some circumstances, a viable option. RMFG did find that there is one IZ setting that does not work well with local fields and that is currently not working as expected and so does not recommend setting “Use Network Zone” to “Yes.”

Background

RMFG conducted extensive testing on various Gateway setups and had extensive conversations with Ex Libris over Basecamp.

Action Log

Action/Point Person

Expected Completion Date

Notes

Status

RMFG finalize recommendation

5/18/2021

Done

PPC approval

5/21/2021

Report out to ICs

5/21/2021