Date
11:00 AM
Attendees
Mark Marrow , UC Berkeley
Jason Newborn , UC Davis
Linda Michelle Weinberger , UC Irvine
Sahra Klawitter , UC Riverside
Micquel Little (Unlicensed) , UC San Francisco
Scott Hathaway , UC Santa Barbara
Joseph Ferrie , California Digital Library
Kristen Cardoso (Unlicensed), UC Santa Cruz
Judea D'Arnaud, UC San Diego
Joe Ameen , UCM (Liaison) NOTE TAKER
Absent
Discussion items
Item | Desired Outcome | Time | Who | Notes | Decisions | Actions | ||
---|---|---|---|---|---|---|---|---|
1 | Check-in/ Updates | PPC meeting updates and review of any action items from last meeting Quick share of any local team updates | All |
|
| |||
2 | Discuss and vote on loan periods and blocks within the AFN ahead of the form draft due date 1/22 | (Test and Go-Live) Harmonization of Loan Periods and Blocks in the UCs Automated Fulfillment Network Do we all harmonize for Test? If so, what values will we use? | All |
| ||||
3 | Prefilled Config Forms | https://drive.google.com/drive/u/3/folders/1lyS4bL08ilj-07tvrGhm3VYxz5sksJEY?ths=true | All | |||||
4 | New Decision Pages to be aware of | |||||||
5 | Prepping for Test Phase (Just keeping from last meeting so we all don’t forget when our Test environments are delivered) | This document lists needed roles, role areas, scopes and permissions that we’ll need to set up inside of our IZs. This would be the minimum setup members need to continue the testing that we’ve been doing. For individuals with multiple libraries on their campus, this will need to be done for every library. Testing accounts will need to be created at each campus as well. Blocks will likely have to be configured locally for each institution. ILLOps will be helping with testing in the next phase. The Vanguard environment goes away on December 18. There are some outstanding areas where responsibility is unclear. This may need to be decided soon and put in writing. Supplier of last resort will need to be configured at each campus. | ||||||
6 | Parking Lot | There are some questions around what other things this group might add to the parking lot. Expiration dates and whatnot.
| Members can add to the parking lot issues that they feel need to be considered or tracked. | |||||
7 | RLF Non-Circ items requestable for in-house use | Will need to test in Test Phase | There are some hacks used for library-use only items that can’t be checked out and back in because it will kick off a return process. This will have to be figured out for ExL. Davis tried creating a “Reading Room” circulation room. This was difficult for circulation staff to manage. There is now a transit step between ILL and the circ desks that allows the item to be checked out again before initiating the return process. | |||||
8 | RLF Ghost Records Discussion | This decision will be worked out throughout the test phase. | ||||||
9 | DDS Decision Page (Test Load) Document Delivery Service (DDS) Setup Config forms - local campuses | Will need to be tested during the Test Phase |
| |||||
10 | Harmonization work | Continue our discussion and come up with loan periods to propose for fulfillment network/locally https://docs.google.com/spreadsheets/d/1-W2psaW6GsgOTD1ByTHRF00bikcnVR6W/edit#gid=1939968629 | ||||||
11 | Total | x/x |
Future agenda items
Form requested by Ex Libris: what is our role in completing the form? what is the role of local implementation teams? (see https://drive.google.com/file/d/1MbLg08j5grFfaCMGQ9Pde1UBmw06UAqf/view?usp=sharing )
Discussion with Discovery team about naming/labeling of UC Interlibrary Loan button.
Should we modify our decision page to recommend “Lender of last resort” as the preferred ILL integration model.
SILS ILL CKG and/or town hall resource sharing demo.