Date
11:00 AM
Attendees
Mark Marrow , UC Berkeley
Jason Newborn , UC Davis
Linda Michelle Weinberger , UC Irvine
Sahra Klawitter , UC Riverside
Micquel Little (Unlicensed) , UC San Francisco
Scott Hathaway , UC Santa Barbara
Joseph Ferrie , California Digital Library
Mallory DeBartolo (Unlicensed) , UC Santa Cruz
Judea D'Arnaud, UC San Diego
Joe Ameen , UCM (Liaison) NOTE TAKER
Weekly Testing
The Fulfillment FG and ILL Ops should conduct tests with the following scripts in the order outlined below. The AFN will be configured first, then IVEA, and finally NCIP. The groups will aim to test 2-3 during their weekly meeting. Additional tests will be added as needed.
Absent
Discussion items
Item | Desired Outcome | Time | Who | Notes | Decisions | Actions | ||
---|---|---|---|---|---|---|---|---|
1 | Check-in/ Updates | PPC meeting updates and review of any action items from last meeting Quick share of any local team updates. | All |
| ||||
2 | VDX integration update | Determine what is left to complete supplier of last resort and NCIP config for VDX test. | All | Needed:
| ||||
3 | Placeholder for RLF meeting 4/6 updates | |||||||
4 | Manual Blocks Basecamp ticket updated | https://3.basecamp.com/3765443/buckets/15553579/messages/3582181846 https://docs.google.com/document/d/10VbI85urpPpFWYfpTputsYt4NUUuvjHa/edit#heading=h.30j0zll Check basecamp ticket to see if Svetlana came up with answers to our questions | All | |||||
5 | Group Testing w/ ILL Ops | https://docs.google.com/document/d/14VYIW1-ZPYvcxR4Mq2n_LWA-q2ZDcyUe/edit https://docs.google.com/document/d/14qTTJFzufw2eEHGNwQlihU0eAYLPYbtg/edit https://docs.google.com/document/d/1owqWoFJjeNElh1tO6_asCL0uGNtLJQ2f/edit https://docs.google.com/document/d/1YSeipVTugrgfvMjVsohNJWQk4oaIAnIz/edit | All | |||||
6 | Parking Lot | Members can add to the parking lot issues that they feel need to be considered or tracked. | ||||||
7 | RLF Non-Circ items requestable for in-house use | Will need to test in Test Phase | There are some hacks used for library-use only items that can’t be checked out and back in because it will kick off a return process. This will have to be figured out for ExL. Davis tried creating a “Reading Room” circulation room. This was difficult for circulation staff to manage. There is now a transit step between ILL and the circ desks that allows the item to be checked out again before initiating the return process. This issue does not just apply for LUO items, but specifically to the RLFs. | Mark will reach out to Lynne Grigsby regarding this question, and based on this discussion, Joe F. and Elizabeth will start a discussion in Basecamp with Ex Libris if needed. | ||||
8 | RLF Ghost Records Discussion | This decision will be worked out throughout the test phase. | ||||||
9 | DDS Decision Page (Test) Document Delivery Service (DDS) Setup Config forms - local campuses | Will need to be tested during the Test Phase |
| |||||
10 | Total | x/x |