Item

Desired Outcome

Time

Who

Notes

Decisions

Actions

1

Check-in / Update

Report any major changes in availability / circumstances

5

SCCampus stuff continues to pop up occasionally, but otherwise doing well. Planning for physical opening to varying degrees.

Image Added

2

PM needs

Have a list of stuff that a PM needs to do

525

SC

4

Alma Certification

Understand how to figure out which UC staff should get certified

5

SC

https://knowledge.exlibrisgroup.com/Alma/Training/Alma_Administration_Certification/01_Certification_Overview_Page

  1. Review the list of recommended certifications and give feedback

    1. Be careful about use of “required” - agree that recommended is strong on all cases.

    2. What about ILSDC being required? Ask that group / local reps?

    3. What about ICs being required? Take this to the whole group → make it “strongly recommended” and let people opt in

  2. Local teams: not necessarily ASAP certification, but just figuring out who should get certified at each local group. Any feedback on this approach?

  •  Caitlin Nelson make Alma certification an agenda item for IC 28th meeting - send out an email for preread + discussion
5

Other / Homework

6

TOTAL

60
  • Tracking: there may be a need, but what degree is appropriate?

  • Monitoring deadline, and supporting ICs = SC

    • Individual meetings with each campus rep

      • 2 SC members per rep (nice to have co-chair and PM)

      • Make these monthly? default 30-min monthly checkin

  • Hard to know who’s doing what on Basecamp - there is just so much going on there…

    • Can a PM filter that out and put it into a more readable format? → Com Leads?

    Keeping track of deadlines on Basecamp - working with ExL project team = PMs
  • Need: putting together a spreadsheet so that we understand each campus' needs

    • Campus-level checklist? Campus relationship to the master list, problems, issues, etc.

    • Master checklist

3

Review of where we’re at: “Data migration prep” stage

Understand how to make the best use of our group time, ExL time, etc. Strategize on paths forward, messaging needed.

30

SC

Discussion point / assumptions:

  • We are not comfortable with pushing back the vanguard dates

  • The vanguard is the first of at least two test points; the stakes are only so high.

    • Can “good enough” be a win? Instead of a loss?

  • Being in the vanguard does not preclude you from doing whatever you were going to do for test.

  • Talk about expectations for the vanguard - what does success look like? What is the minimum we can do?

    1. Not as bad as you thought

    2. Confirmed which things are bad and need to do

    3. Ex Libris might have some tools and point to here’s what cleanup you can do after

  • There are no downsides to doing vanguard other than the pressure you’ve put on yourself to be perfect.

  • ICs as the holders of the line - we have to be the ones with our eye on the stakes and the scope. What do you need to feel supported in messaging this back to your campus? You need to hold a firm standpoint and not let others freak out.

    • What does your staff need to hear to feel better?

  • How do we know what data really needs to be fixed before doing that test?

Scenarios:

  1. Everyone puts in “dirty data” with only the required changes (local fields tagged, etc.)

  2. What is the next level of cleanup that you’d want to do?

Actions:

  1. Move up the Q&As for the campuses in general

  2. Move up the ERM Q&A for CDL related things

  3. Ask for ExL validation help, as offered: UCB, UCSD, UCSF

    1. What is the downside to doing this? What are the costs?

What do we want to come away with?

  • People feel okay with an imperfect vanguard

  • Agreement on guiding principles for MVP

  • We have some concrete asks for ExL

  •  Tom Bustos invite Catherine Busselen to the 28th
  •  Caitlin Nelson to send email to ICs to prep for “guidelines for MVP” for vanguard; prep for concrete asks for ExL
  • Overall timeline: getting Lena involved for sure.

    • Keeping track of deadlines on Basecamp - working with ExL project team = PMs

3

Ex Libris meetings

Get on the same page about where we’re at with meetings

10

Lena/ Caitlin

We had our first 90. After your second 90, do you think you will be able to have all the data you need to make a more informed estimate for a realistic migration timeline? If not, is there anything the PM/SC can do to help direct the 2nd 90m meeting to get what you need? Make sure you get what you need from the second meeting to be able to make that estimate. We will advocate for you, and in order to do that we need the UC estimate as soon as possible.

One of the SC members should attend the ExL meetings as a listener.

4

Timeline discussion

Strategize on timeline

10

SC

How can we make the vanguard more spacious? Do we extend the deadline? Yes maybe, but need to protect the Test Load timeline because of possible COVID / library openings.

5

Next agenda

Get some items on the next agenda

10

SC

  • Check in on the ExL meetings

    • Lingering questions that prevent ICs from scoping a deadline?

    • What do we still need?

  • Underscore the need for getting estimates

  • P2E

  • Indv checkins

How can we change our meetings now that we have our ExL PM (so we can set agenda for meetings?

6

Other / Homework

7

TOTAL

30 / 60