Date
11:00 AM
Attendees
Mark Marrow , UC Berkeley
Jason Newborn , UC Davis
Linda Michelle Weinberger , UC Irvine
Sahra Klawitter , UC Riverside
Micquel Little (Unlicensed) , UC San Francisco
Scott Hathaway , UC Santa Barbara
Joseph Ferrie , California Digital Library
Mallory DeBartolo (Unlicensed) , UC Santa Cruz
Judea D'Arnaud, UC San Diego
Joe Ameen , UCM (Liaison) NOTE TAKER
Weekly Testing
The Fulfillment FG and ILL Ops should conduct tests with the following scripts in the order outlined below. The AFN will be configured first, then IVEA, and finally NCIP. The groups will aim to test 2-3 during their weekly meeting. Additional tests will be added as needed.
Absent
Discussion items
Item | Desired Outcome | Time | Who | Notes | Decisions | Actions | ||
---|---|---|---|---|---|---|---|---|
1 | Check-in/ Updates | PPC meeting updates and review of any action items from last meeting Quick share of any local team updates. | All |
|
| |||
2 | Manual Blocks Basecamp ticket updated | https://3.basecamp.com/3765443/buckets/15553579/messages/3582181846 https://docs.google.com/document/d/10VbI85urpPpFWYfpTputsYt4NUUuvjHa/edit#heading=h.30j0zll Check basecamp ticket to see if Svetlana came up with answers to our questions | All |
| ||||
3 | Group Testing w/ ILL Ops | https://docs.google.com/document/d/1WOelxmH3L0lDQYKZu683FKZ-DIjHCe9NfwJojyp5bMw/edit# https://docs.google.com/document/d/14VYIW1-ZPYvcxR4Mq2n_LWA-q2ZDcyUe/edit https://docs.google.com/document/d/14qTTJFzufw2eEHGNwQlihU0eAYLPYbtg/edit https://docs.google.com/document/d/1owqWoFJjeNElh1tO6_asCL0uGNtLJQ2f/edit https://docs.google.com/document/d/1YSeipVTugrgfvMjVsohNJWQk4oaIAnIz/edit | All |
Logged in as a graduate student. Looked up a journal. Request through ILL. Some information is pre-populated. Clicked on the Description drop-down menu. There is no null option. (This has created issues before.) Submitted the request. The request shows in the “My Account” page under the HOLDS tab. The request shows in Alma on the “Resource Sharing Borrowing Requests” page. The Barcode populated in the request. A Rota was created. Worldshare doesn’t appear in the Rota though. In UCLA’s Alma > Pick Up Requested Resources. Once facets were changed the request shows up. Page numbers and article title did not transfer with the request. Went to “Scan In Items” Scanned in item barcode. Changed location to the digitization department. Clicked “Manage In Process Items” Clicked “Next Step”, now an attachment option appears in the three-dot menu. Click the Done button. Back in the UCSC Alma: Not much information. Shows that it’s been completed and that there were no shipping costs. | ||||
4 | Parking Lot | There are some concerns that there is no clear place to note physical condition of items in the AFN. It may be possible when scanning in items. Another option may be using fulfillment notes. For the time being best practices might be shared via e-mail, sent to the FG and ILL Ops. Testing documentation could be hosted on Google or Box and shared out with a public link. | Members can add to the parking lot issues that they feel need to be considered or tracked. | |||||
5 | RLF Non-Circ items requestable for in-house use | Will need to test in Test Phase | There are some hacks used for library-use only items that can’t be checked out and back in because it will kick off a return process. This will have to be figured out for ExL. Davis tried creating a “Reading Room” circulation room. This was difficult for circulation staff to manage. There is now a transit step between ILL and the circ desks that allows the item to be checked out again before initiating the return process. This issue does not just apply for LUO items, but specifically to the RLFs. | Mark will reach out to Lynne Grigsby regarding this question, and based on this discussion, Joe F. and Elizabeth will start a discussion in Basecamp with Ex Libris if needed. | ||||
6 | RLF Ghost Records Discussion | This decision will be worked out throughout the test phase. | ||||||
7 | DDS Decision Page (Test) Document Delivery Service (DDS) Setup Config forms - local campuses | Will need to be tested during the Test Phase |
| |||||
8 | Total | x/x |