Scope

Test

Description

This decision page captures the areas of harmonization for the UCs Fulfillment Network. These parameters were used during the Vanguard phase of the project.

Decision

The following parameters will be used to set up the UCs Fulfillment Network in Alma during the Test phase of the project.

Owning group

Fulfillment and ILL FG

Approver

PPC

Stakeholders

R = Fulfillment and ILL FG
A = Fulfillment and ILL FG
C = UC Local FGs
I = PPC, ICs

Decision-making process

Fist of Five

Priority

High

Due date

Recommendation

The recommendation for Test Phase and potentially Go-Live is to use the following settings when configuring the UCs Fulfillment Network. These settings will not apply to non-UC ILL. These settings were arrived at by reviewing current UC loan periods. We feel that a 90 day renewable due date capped at 360 days would best meet the needs of all the campuses, and satisfy UC borrowers used to a one year due date for ILL items. Additionally, the group felt that 90 days was a good starting point in case amendments need to be made in the future. It would be more difficult to consider a decrease in the due dates for our UC patrons at a later time. We also recommend that these parameters be reviewed a year post go-live, and amended as needed.

Areas of Possible Harmonization (Only for UC items borrowed within the UCs Automated Fulfillment Network)

Due Date

90 Days

Grace Period

None

Recallable by patron

No

Renewable

Yes

Lost Item Fine

None

Lost Replacement Fee

Default to local item replacement fees

Maximum Renewal Period

360 Days

Recall Period

7 Days

Recalled Overdue Fine

None

Will consider $5/Day for Go-Live

Requested Item Due Date

7 Days

Due Date given to a patron with the item checked out, once another patron requests it from them.

Hold Shelf Period

7 Days

Borrowing Block for Lost Item

Yes

Borrowing Block for Excessive Fees

Yes

Background

ILL for UC patrons will become the UCs Fulfillment Network (technical, not official name) managed using ALMA. Non-UC ILL will continue to be conducted using VDX. There are several areas of possible harmonization between UC Libraries when configuring the UCFN. Although the harmonization is not necessary for the UCFN to function, we feel it is important to harmonize these areas to limit confusion of due dates/locations for the borrower.

Dependencies

Will local recall fees override the network setting?

When do fines occur? Returned at the owning institution, or the institution handling the loan?

Will automatic blocks move over to Network Zone or not?

Action Log

Action/Point Person

Expected Completion Date

Notes

Status

Fulfillment and ILL FG

Decision page created to capture possible areas of harmonization for the UC Fulfillment Network based upon the harmonized settings used for Vanguard

DONE

Fulfillment and ILL FG

Fulfillment FG meets and discusses whether or not changes should be made to the Vanguard harmonized settings.

  • System-wide FG members feel that the settings should remain the same, but will discuss with local teams before a final vote next week.

DONE

Fulfillment and ILL FG

Fist of Five Vote- Unanimous Support

  • Group voted to move forward with the above parameters for Test Phase. Will review again for Go-Live

DONE