Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Date

11:00 AM

Attendees

Weekly Testing

The Fulfillment FG and ILL Ops should conduct tests with the following scripts in the order outlined below. The AFN will be configured first, then IVEA, and finally NCIP. The groups will aim to test 2-3 during their weekly meeting. Additional tests will be added as needed.

 Fulfillment and ILL Ops Testing
  • Viewing Network Activity (shared patron loans and contact information)
  • UC User With No First Name in their IZ record
  • Add/Delete/Save Data to Patron Record
  • UC User Stub Record Shared Information Fields
  • Manual Blocks (04 ILL and 05 All) Applied Locally for Users
  • No OCLC Number- Available Title Direct FN Request From SRLF
  • Walk-in user from other UC (Faculty)
  • Proxy Walk-In User from Other UC
  • Walk-in user from other UC (Blocked User)
  • Patron renewal in Primo
  • Digitized Article AFN Request
  • Patron With Expired Account (Account Renewal/Item goes to Lost and Fee is Charged)
  • Available Monograph AFN Request
  • Patron Request for Item (Pickup from alternate location/expired hold)
  • North to South/South to North Rota Test
  • AFN Monograph Request- Not Filled
  • rlf non-circ/building use item request using AFN
  • Fines/Fees Graduate Student
  • Due date when a library is closed

Absent

Discussion items

Item

Desired Outcome

Time

Who

Notes

Decisions

Actions

1

Check-in/ Updates

PPC meeting updates and review of any action items from last meeting

Quick share of any local team updates.

All

2

Decision Review and Vote

Review/Vote/Send to ICs

(Go-Live) Harmonization of Loan Periods and Blocks in the UCs Automated Fulfillment Network - Basecamp opened regarding changing to open days, harmonization, and what can/can’t be changed at the IZ level https://3.basecamp.com/3765443/buckets/15553579/messages/3832319657

All

3

To Do For Go-Live

All

4

Group Testing w/ ILL Ops

https://docs.google.com/document/d/1W4gbt1UFYLmIgCVYCpO-_vZ5vp98WNgdolUojyEoKdE/edit

We can test the second one using the checkouts from the first test

https://docs.google.com/document/d/1YSeipVTugrgfvMjVsohNJWQk4oaIAnIz/edit

All

5

Parking Lot

Members can add to the parking lot issues that they feel need to be considered or tracked.

6

Digitization Kinks

Just keeping these here so we don’t lose track: https://3.basecamp.com/3765443/buckets/15553579/messages/3747769701

https://3.basecamp.com/3765443/buckets/15553579/todos/3734877569

Salesforce Case Submission- Digitization

7

Manual Blocks Basecamp ticket updated

https://3.basecamp.com/3765443/buckets/15553579/messages/3582181846

https://docs.google.com/document/d/10VbI85urpPpFWYfpTputsYt4NUUuvjHa/edit#heading=h.30j0zll

Check basecamp ticket to see if Svetlana came up with answers to our questions

All

  • Elizabeth will get back to Svetlana.

8

RLF Non-Circ items requestable for in-house use

Will need to test in Test Phase

There are some hacks used for library-use only items that can’t be checked out and back in because it will kick off a return process. This will have to be figured out for ExL.

Davis tried creating a “Reading Room” circulation room. This was difficult for circulation staff to manage. There is now a transit step between ILL and the circ desks that allows the item to be checked out again before initiating the return process.

This issue does not just apply for LUO items, but specifically to the RLFs.

Mark will reach out to Lynne Grigsby regarding this question, and based on this discussion, Joe F. and Elizabeth will start a discussion in Basecamp with Ex Libris if needed.

9

https://docs.google.com/document/d/1WOelxmH3L0lDQYKZu683FKZ-DIjHCe9NfwJojyp5bMw/edit#

https://docs.google.com/document/d/14VYIW1-ZPYvcxR4Mq2n_LWA-q2ZDcyUe/edit

https://docs.google.com/document/d/14qTTJFzufw2eEHGNwQlihU0eAYLPYbtg/edit

https://docs.google.com/document/d/1owqWoFJjeNElh1tO6_asCL0uGNtLJQ2f/edit

10

RLF Ghost Records Discussion

https://uc-sils.atlassian.net/wiki/spaces/FIF/pages/893517831/Records+Retained+for+Items+Deposited+in+RLFs

This decision will be worked out throughout the test phase.

11

Total

x/x

Future agenda items

  • No labels