Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

Date

11:00 AM

Attendees

Absent

Discussion items

Item

Desired Outcome

Time

Who

Notes

Decisions

Actions

1

Check-in/ Updates

PPC meeting updates and review of any action items from last meeting

Quick share of any local team updates

All

  • STRATEGICALLY PLACED REMINDER FOR ELIZABETH TO RECORD MEETING

  • Reminder: pre-populated configuration forms will be sent to UCB, UCLA, UCSD, and UCSF tomorrow 7/31. The drafts will be due back on 8/14 and the final 8/21

    • UCSB and CDL will not be filling in configuration forms at this time. Answer from basecamp “CDL is not listed for the config form tasks as there’s no configuration form for the NZ. CDL however can/should review all trainings and attend meetings to understand what other consortium members are doing.”

  • Devote next week’s meeting time to special Fulfillment network session with Ex Libris on August 6, from 10-12.

    • Meeting Agenda:

      • Fulfillment Network Attributes

      • Fulfillment Network – Direct Request

      • Automated Fulfillment Network

      • Configuring Fulfillment Network

      Who Should Attend: 

      •  Those who will be making Fulfillment Network decisions and choices

  • Reminder UCI DDS Demo Meeting next week.

  • 01 Introduction to Fulfillment Networks Resource Sharing (4 min)

https://knowledge.exlibrisgroup.com/Alma/Training/Resource_Sharing/D_Fulfillment_Networks_Resource_Sharing/01_Introduction_to_Fulfillment_Networks_Resource_Sharing

  • 02 Walk-In Scenario in a Fulfillment Network (4 min)

https://knowledge.exlibrisgroup.com/Alma/Training/Resource_Sharing/D_Fulfillment_Networks_Resource_Sharing/02_Walk-In_Scenario_in_a_Fulfillment_Network

  • 03 Direct Patron Requests in a Fulfillment Network (4 min)

https://knowledge.exlibrisgroup.com/Alma/Training/Resource_Sharing/D_Fulfillment_Networks_Resource_Sharing/03_Direct_Patron_Requests_in_a_Fulfillment_Network

  • 04 End-to-End Staff Workflows for Direct Patron Requests (3 min)

https://knowledge.exlibrisgroup.com/Alma/Training/Resource_Sharing/D_Fulfillment_Networks_Resource_Sharing/04_End-to-End_Staff_Workflows_for_Direct_Patron_Requests

  • 05 Tracking Patron Resource Sharing Activities (2 min)

https://knowledge.exlibrisgroup.com/Alma/Training/Resource_Sharing/D_Fulfillment_Networks_Resource_Sharing/05_Tracking_Patron_Resource_Sharing_Activities

  • 06 Configuring a Fulfillment Network (4 min)

https://knowledge.exlibrisgroup.com/Alma/Training/Resource_Sharing/D_Fulfillment_Networks_Resource_Sharing/06_Configuring_a_Fulfillment_Network

  • 07 Linking Users in a Fulfillment Network (4 min)

https://knowledge.exlibrisgroup.com/Alma/Training/Resource_Sharing/D_Fulfillment_Networks_Resource_Sharing/07_Linking_Users_in_a_Fulfillment_Network

2

RLF Meeting with ExLibris

I’ll be asking the ICs to set up a meeting in 2-3 weeks with members of our group and reps from the RLFs to discuss their setup in the fulfillment network.

  • Let’s figure out who should attend and plan to prepare a document for ExLibris that includes how we currently interact with the RLFs, and the setup we’d ideally like to retain.

All + Cathy Martyniak (SRLF) and Lynne Grigsby (UCB)

3

Configuration Meeting Debrief

Check-in after meeting before ours to see if there’s anything new we need to be aware of as we do the configuration work in August

All

Vanguard Configuration Form

4

Testing in the Vanguard Environment

Vanguard and non-guard FGs will both get appropriate access to test in the vanguard.

This is the URL to the Vanguard testing scenarios draft ILSDC has been working on: https://docs.google.com/spreadsheets/d/1dFi7lbwbrXzYd4rr_rlvKcQCT0LRGKw7EzzxcuEgBeE/edit?usp=sharing

  • These are a huge number of checklist items to go over!

  • Not everything will apply to each campus, and does not need to be filled in if it doesn’t apply

  • Initially they looked at the harmonization and data cleanup that was made, but that was almost too detailed from ILSDC side of things, especially where there were options.

  • ILSDC: “did the data come over the way you expected it to?” then FGs “okay and does that work for us?”

  • These recommendations are for each campus to take back and do as a checklist.

  • ILSDC will mostly be done with this doc by Aug 7th

  • FGs could also add some tabs to this doc - with the idea that local campus testers will do this work.

  • FG deliverable: List of accounts and roles / permissions needed.
  • Permissions: please make sure that the roles that you request have all the same permissions so that we don’t bump up against permissions problems in testing.

5

ILL broker with Alma decision page

(Vanguard) Decide how to integrate an ILL broker with Alma

Discuss vote delay

Joe/All

6

Harmonization work

Continue our discussion from last week and come up with loan periods to propose for fulfillment network/locally https://docs.google.com/spreadsheets/d/1-W2psaW6GsgOTD1ByTHRF00bikcnVR6W/edit#gid=1939968629

All if there’s time

7

There are some questions around what other things this group might add to the parking lot. Expiration dates and whatnot.

Members can add to the parking lot issues that they feel need to be considered or tracked.

8

Parking Lot

DDS Decision Page (Vanguard) Document Delivery Service (DDS) Setup

UCI DDS Demo with Fulfillment and ILL FG Aug 13th meeting

Feedback received on this:

An additional operation factor may be needed. (Item type)

There needs to be a smooth way to transfer a DDS request into a Borrowing ILL Request when necessary.

9

Total

x/x

Future agenda items

  • No labels