Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Current »

Attendees

Item

Desired Outcome

Time

Who

Notes

Decisions

Actions

1

Record the meeting

remind Alison to record meeting

1

Alison

2

UCOP stats delivery

What are the reports/templates needed and how to get to them and use them.

Are SOC Lending Digital Stats Ready?

30

All

Borrowing: Physical/Digital

(Design Analytics/Catalog/Shared Folders/Community/Reports/Consortia/UCS/ILL and Resource Sharing: RS A PT schedule C borrow report (by borrower)

Lending: Physical

(Design Analytics/Catalog/Shared Folders/Community/Reports/Consortia/UCS/ILL and Resource Sharing: RS A PT schedule C report (physical lending)

Lending: Digital

(SILSOpsCenter. Put in Google drive: https://drive.google.com/drive/u/0/folders/1gLj8oc91r3hTwKHU2-6EqfiZR05DxdIJ )
Qs from SOC: feedback on previews → which (both?) to include ('data' or ‘formatted’)? Any suggestions for formatting? comments on conversion to gsheet (eg. just upload the excel, not gsheet or ‘don’t care either way…).

  • Dawson will format lending report ; make a new copy with a generic name
  • access to SOC folder: options (1) just RS OST gdrive + PT (2) named specific people (3) open to anyone with a link Peter Devine email RS OST
3

Update on anonymization mitigation report status / Statistical user category workaround instead

10

Alison

meeting with SB (eXl) & PD, AMR, LMW, JN, MDB

4

schedule c comm. plan (stakeholders

https://libraries.universityofcalifornia.edu/wp-content/uploads/2022/07/Campus_Contacts_for_Library_Statistics_2022.pdf → not right list for schedule c contacts

mostly RS OST (itself) & ILL CKG

5

Wrap up

Review actions and decisions

5

All

next time:

review Physical lending report

schedule c comm. plan for whole RS OST & ILL CKG; (RS OST can distribute on campus as needed)

6

Bike Rack

Capture important topics for future discussion

Other reports (besides Schedule C) we will need from Alma (look at VDX/CDL run reports for ideas?)

dates (maybe later) → by months for reports

pick up from hold shelf rate for AFN items (from borrower side…)

7

Total

x/x

  • No labels