CDL/NZ Purchasing Workflow Recommendations for Test Load

Legend: not started IN PROGRESS STALLED decided

Status

decided

Scope

Test Load

Description

Recommendations for data preparation for Test Load related to supporting CDL/NZ electronic resources workflows, including data analytics for CDL/campus resources.

Decision

AEFG acknowledges that workflow testing will continue beyond Vanguard. Initial recommendations include using Tertiary Reporting Code* for CDL/campus linking in order record (see Vendor Decision Page); and using single institution as “Available For” in NZ for flexible management of members at the service level of an electronic inventory record.

Owning group

AEFG + (lcspagnolo at ucdavis.edu)

Approver

PPC

Stakeholders

R = AEFG and PPC CDL/NZ
A = PPC
C = ICs, local implementation teams
I = cohort

Decision-making process

Iterative discussions among AEFG and PPC CDL/NZ; development of components that need action for data extract for test load; confirming between AEFG and CDL/NZ groups; AEFG documents recommendation.

Priority

High - thorough and consistent functionality/procedures needed for go-live.

Due date

Oct 28, 2020 October 28, 2020

Recommendation

Testing of workflow and systemwide reporting will continue through Test Load. No changes to data in advance of Test Load for the purpose of consortial systemwide purchasing workflow has been identified by the PPC deadline. Assessment and testing in this area (and continued design and refinement of workflows) will continue through Vanguard availability and through the implementation phase. As workflows are developed that indicate potential need for migrated data changes or post-migration cleanup, these will be identified and documented separately.

Preliminary workflow recommendations to facilitate local cost reporting include having IZ’s use CDL as the local PO/Invoice’s Material Supplier and reflect CDL’s “Materials Supplier” vendor via use of Tertiary Reporting Code in the order record. Please see Vendor-Related Recommendations for Test Load decision page for more information. *NOTE: options will be explored for any campuses already using the tertiary reporting code field. As of writing, most campuses had this field free.

Preliminary workflow recommendation: To reflect participants, use inventory groups containing a single member institution. “Available for” should be set at the service level when available.

Reasoning

Testing of basic workflow and data migration resulted in many questions regarding functionality of the system and results of data migration processes. Due to the time required to define and report these issues, testing capacity during Vanguard was limited for more complex workflow design, testing and analysis.

Background

This is a broad decision page that covers multiple specific test cases covering different electronic resource types, purchase models, and the end result for generating reports from the Alma and Analytics systems, as well as ensuring expected resource display in Primo.

Dependencies

What reports need to be generated from Day 1?

End user expectations for resource display in Primo

Questions to consider

Scenarios covered by this page include, not limited to:

Resources and Workflows

  • Participants and participation changes

  • Renewing resources and cost-share recalculations

  • Assisted Tier 3

  • Selective title package

  • Existing IZ POs for CDL-purchased resources

  • Communicating transactional payments performed by CDL (NZ) on behalf of IZ

  • Systemwide vs Multicampus purchases

  • Resource acquisitions

  • Resource activation

Display

  • Display of NZ licensing terms in IZ Primo

  • Display of NZ activated resources in IZ Primo

Reporting

  • Ability to identify local purchases by multiple campuses for systemwide licensing candidates

  • Calculation of systemwide spend per vendor

  • Calculation of campus spend per vendor (directly paid and paid via CDL)

  • Calculation of campus spend per vendor for CDL-managed resources

  • Systemwide cost per use per campus

 

Action Log

Action/Point Person

Expected Completion Date

Notes

Status

Action/Point Person

Expected Completion Date

Notes

Status

AEFG extended subgroup to discuss CDL/NZ workflows, intersections for IZ support.

October 8, 2020

 

Done.

Holly - Build consortial workflow template, steps to share with AEFG members.

October 8, 2020

See AEFG Google Drive space, Testing folder (links to CDL Consortial Workflow space).

Preliminary basic template done for Vanguard, continuing in test load for additional scenarios and refining.

Additional AEFG testing during Vanguard phase, including Vanguard members building out consortial purchase examples.

October 30 2020

See AEFG Google Drive space.

Done for Vanguard.

Final Vanguard Decision Page drafted, AEFG review.

October 29, 2020

 

Done. 11/4/2020 AEFG Call

Share progress with PPC.

October 30, 2020

 

Pending

Structure test load plan, deliverables. Include reporting code accommodations.

Early November, 2020

 

Pending

 

The SILS mission is to transform library services and operations through innovation and collaboration. The future is shared!

Question? Contact AskSILS-L@ucop.edu