2021-09-22 ACQ/ERM FG Meeting notes

Date

Sep 22, 2021 11:00AM-12:30PM

Attendees

  • @Lisa Spagnolo, UC Davis (co-chair/convener) (timekeeper)

  • @Mark Hemhauser (Unlicensed) , UC Berkeley

  • @Paula Pascual , UC Irvine (arriving later)

  • @Stacy McKenna , UCLA

  • @Sarah Sheets , UC Merced

  • @Carla Arbagey , UC Riverside (co-chair) (notetaker)

  • @Lisa Wong , UC Santa Cruz

  • @Judy Keys , UC San Diego

  • @Susan Boone , UC San Francisco

  • @Lisa Mackinder , California Digital Library (arriving later)

  • @Maricel Cruz (Unlicensed) , UC Santa Barbara

Discussion items

Item

Desired Outcome

Time

Who

  • Notes

Decisions

Actions

Item

Desired Outcome

Time

Who

  • Notes

Decisions

Actions

1

Assemble

Getting situated, reviewing agenda, roles

2

Lisa S.

 





2

Admin Items

  • Announcements

  • Other

3

Lisa S.

 

 

 

Remember to check/add your out dates in our tracker

3

Updates: specifically from PPC (and other SILS groups)

Shared understanding of PPC and other SILS group activities, including what is routing to/affecting our FG.

10

Lisa S. / Others

PPC : no meetings 9/10 or 9/17

 

 

 

 

 

Add Analytics Proposal Update to our next agenda to discuss further, once more details are finalized

4

TSELG Request for Licensing

Shaping response/actions for TSELG request related to licensing

15

Lisa s. / all

Related to 005.

Draft sketch of response with areas to consider:

  • Bandwidth while our FG members are dealing with post-migration projects - this could be something Phase 5 group could take on

  • Question of whether we can share unredacted licenses

  • Linking the license to another record in Alma - POL

 

@Lisa Spagnolo Consult with Ellen and Lisa M. to see if we can share unredacted licenses
5

Reviewed MVP Work

Review/refinement of past decision pages and related functional areas for updates, additional documentation, etc.

20

All

E-Resources-related (e.g., 001 and 002)

  • CDL recharges: coordinating with identifying CZ collections for attaching campus POLs?

    • Use of NZ for attaching POLs (002) - coordinating “production” testing? What is the process for linking our POL from our local suppressed record to one in the NZ?

    • Need to test linking in the sandbox then use a sample case in production to test what will happen with Analytics

  • Reporting Codes: testing use for CDL/campus Analytics - what is needed to confirm this as use case for intended NZ-IZ connection? what are local campus needs? are there other ways to get at this data?

    • Can we reserve just one code for CDL use instead of two?

Any 003 Import Profiles adjustment, other RMFG-coordinated pieces

  • Norm rules for local needs

Workshop on linking to NZ e-collections: meet this Friday 9/24 at 11am

Norm Rules: collaborate via Google Doc

@Paula Pascual to host workshop on 9/24
@Lisa Mackinder Consult with Adriana and Gem to see if needs can be met with one reporting code reserved for CDL use
@Lisa Spagnolo Set up Google Doc for norm rule collab
6

Electronic Resources Updates

Ensure AEFG awareness of subgroup activity, major issues for review/input.

15

Lisa S. / others

Outbound Linking Workshops - 9/22

  • Spreadsheet of updates to be maintained on weekly basis.

Other e-resources related:

  • Factiva, other CDL-coordinated work

 

From 9/1:

Lisa M will follow up communication among CDL;

Lisa S with discovery and end user and PPC groups.

7

Continued MVP Work

9/22: Progress Update and Assessment for Next Work - as able

10

All

 

 

 

Everyone: what other issues do we want to look at for the remainder of SILS Phase 4?

Lisa S. to mark MVP 012 as Done / should have brief decision page to represent item.
All: enter in reports on Analytics Reports Capture doc - as able.
8

Off-boarding

Introduce, fold in as recurring item to prepare for hand-off

5

Lisa S.

 

 

9

Wrap-up

Identify/confirm next actions

5

All

Another show and tell? Possible topics: fund management, recharges, EDI invoicing

 

 

10

Parking Lot

To save for future discussion

85/85

 

Licensing discussion: Need to build out timeline, investigate what data can be exported, what we need to have in place. // Assessing for Phase 4/Hand-Off

Training placeholder: EDI invoicing.

Analytics: look into doing an internal training session once MVP decision pages are done - NOTE SILS-Wide Analytics sessions in September / / Assessing for Phase 4/Hand-off



 

 

 

 

The SILS mission is to transform library services and operations through innovation and collaboration. The future is shared!

Question? Contact AskSILS-L@ucop.edu